| Major Structural Elements at Heathrow T2 completed on Time with Bamtec Roll-Out Steel Reinforcement 44 views |
| 3/16/2011, Under a four million pound contract, Hy-Ten has supplied rollout reinforcement for the concrete aprons that form the structural core of the new Heathrow T2 building. read more |
| |
| Prefabricated Roll-Out Steel Reinforcement for Luton Academies Construction 40 views |
| 4/20/2011, Barnfield South Academy and Barnfield West Academy in Luton have been completed and handed over on time, thanks in part to the use of Hy-Ten’s rollout steel reinforcement system for concrete, Bamtec. read more |
| |
| Largest Concrete Frame Building Completed On-Time With Bamtec Prefabricated Steel Reinforcement 32 views |
| 5/31/2011, One of the largest concrete frames in the UK, the Forth Valley Royal Hospital, was completed on time using Bamtec, an off-site fabricated steel carpet of slab reinforcement. Bamtec is manufactured by steel reinforcement specialist Hy-Ten in the UK. read more |
| |
| Positional Couplers From Hy-Ten Extends Frictional Welded Coupler Ranges for Concrete Reinforcement 55 views |
| 11/30/2011, Hy-Ten, a pioneer in the UK in the use of friction welded coupler technology for structural reinforcement of concrete, has extended the technique to embrace a new positional coupler range. read more |
| |
| Bamtec Roll-Out Concrete Reinforcement Speeds Completion of Biosciences Incubator 34 views |
| 3/21/2012, The Stevenage Biosciences Catalyst has got off to a flying start with the aid of Hy-Ten’s innovative Bamtec concrete reinforcement system. read more |
| |