First, the multi-functional converter refining method.The traditional one is the use of torpedo tanker refining hot metal desulphurization, dephosphorization pretreatment. Due to the small reaction area this torpedo tank pretreatment desulfurization, dephosphorization low efficiency, long processing time. Therefore, in order to match with the steelmaking process, we must strengthen the hot metal pretreatment. In recent years, the development of the use of a converter of the remaining period, in the converter before desulfurization, dephosphorization, intermediate slag discharge and then subjected to decarburization blowing multifunctional converter refining method. With this new technology allows the steelmaking time control in 70 minutes, the end of phosphorus =0.025%, and due to the significant increase in the furnace heat margin, and not after the dephosphorization of steel, you can use a lot of scrap. Because the process is carried out in the same furnace dephosphorization, decarbonization, put it in the middle of slag rate have a significant impact on the end of the phosphorus, therefore, in the desulfurization and dephosphorization stage refining slag release and good slag is very important, Requirements put slag rate remained stable at 70%. In order to improve the rate of discharge, but not so hot metal slag outflow slag composition should be optimized and top-blown gun control, to ensure foaming slag in the state.
Second, put the iron slag refining method.
With special steel to reduce the phosphorus content of the increasingly high demand for the inclusion of more stringent requirements, dephosphorization converter refining capacity above law inadequate, not completely omitted torpedo tank of hot metal pretreatment. Thus the development of mission residue rephosphorization minimized put iron slag refining method. Intermediate converter slag refining method of discharge was 70%, out of iron slag refining method put desulfurization, dephosphorization exhausted after all that, and then the residue is completely released and then re-installed furnace hot metal dephosphorization, the slag and complete separation of iron reduces the phosphorus content of decarbonization of molten iron. Using iron slag discharge method greatly improves the dephosphorization refining capacity, even if the molten carbon> 0.50%, after the end of phosphorus decarbonization can be reached =0.010%, thus completely omitted torpedo tanker hot metal pretreatment.
Third, casting new technology.
At present, a large manufacturer of special steel bars Wire mostly with large slab caster. Advantage is a large slab of high yield, for the manufacture of high purity steel, but needs to be blooming, and furnace fuel costs have increased. On the other hand, although near net shape billet having the advantage of not requiring cogging, but the small size of its cross-section, the compression ratio due to the requirements of the final product specification is limited, and production efficiency is low. To solve these problems, in recent years, the development of both the advantages of near-net shaped billet (isotropic, low cost), there are large sections of slab advantages (high productivity, good floating inclusions) of new technology, will In section slab (220mm × 220mm) casting and direct blooming together.