Britain’s leading name in elite-quality pipeline maintenance services is proud to announce the completion of more ambitious projects for prestigious clients. The team at Allied Pipefreezing Services Ltd. recently signed off jobs for not only NHS Scotland, but an off-shore North Sea oil platform and the Caribbean Princess cruise liner as well. In each instance, the team invested over two decades of experience in the projects, exceeding expectations and delivering outstanding results. The Allied team has spoken with great pride after receiving the full backing and recommendations from such prestigious clients, cementing this British brand as a true global industry leader.
NHS Scotland
“A section of 3” DHW copper pipe had, over the years, been rubbing on its support. Over time this had caused a hole to wear through the wall of the pipe and subsequently began to leak. The pipe was providing DHW to a number of critical wards within the hospital. The impact of shutting down the system to carry out the works was staggering. As a result, the hospital engineers had to look at alternative ways of affecting a repair. In addition to the urgent repair the hospital estates team had identified a number of existing cast iron valves in the system that had to be replaced due to failure and their unsuitability for the system. To mitigate any issues with bacterial growth and to maintain services to the ward the hospital approached APS to offer a suitable solution.” – Allied Pipefreezing Services
The highly sensitive nature of the task brought to APS by NHS Scotland called for extreme innovation, creative thinking and the highest-level expertise. The APS team formulated a plan to isolate the area of the pipe causing the problem, in order to carry out the necessary repairs while still allowing DHW to flow to key wards as required. The project in its entirety was handled during out-of-office hours, in order to minimise disruption.
Caribbean Princess Cruise Liner
“Following the installation of a new High Fog Fire Fighting system to upgrade the existing system on a cruise ship there was an area where the new system had to be tied into the existing. The works included the need to install two new tee sections complete with inline isolation valves. The ship was in full service and was only in dock for a few hours. The modifications had to be carried out during the time she was docked. To complicate matters further, as the works were on the ships fire suppression system, it was imperative that the works went ahead without complication. Any delays could mean the ship would not sail and 3000 passengers would be delayed or have their cruise holiday cancelled. All the works were overseen from start to finish by a Lloyds Register inspector. He would have the final say as to whether the ship was sea worthy following the completion of the works.” – Allied Pipefreezing Services
APS was approached by Atlantic Pacific Marine with a seemingly impossible request. Nevertheless, the team’s state-of-the-art approach to pipe freezing
allowed them to freeze the section of the pipe to be worked on, successfully install the new tees and have the job completed within the three-hour bracket. Even the client thought it was an impossible request – all in a day’s work for APS.
For further details or to check out additional case studies, or to get in touch with the APS team visit our website.