Need Shorter Lead Times?We are seeking business partners in a number of areas, including, but not limited to:
• Lighting
• Automotive
• Appliance
• Furniture
• Surgical Medical Equipment
• Lawn & Garden
Our capacity has nearly doubled giving us tremendous available production time and allowing us to turn jobs around in record time.
If you are experiencing long lead times, our engineers can, and have, already adapted existing tooling to fit this or one of our other 15 presses to provide you a seamless transition.
Most Recent Equipment Additions
Seyi – Sutherland 176-Ton Mark 2
• Auto Stamper
• Variable Speed (0-50 SPM)
• Dual Crank Shaft
• Stroke: 7.87”
• 2’ x 5’ RAM
• 30” X 80” Bed
• Hydraulic Clamping System
• Safety Lights
• Wintress SmartPAC 2
• 24” CRS Feed Lease / Straightener / Accuracy .001
• .090 x 24” CRS Reel 6,000 lb. Capacity
• Caldwell Coil Upender -10,000 lb. Capacity
• Overhead Crane - 6,000 lb. Capacity
[URL]www.bahrsdie.com[/URL]