The quality of the coordination drawing effort varies significantly, depending on the ability of the coordination firm. Some people try to save time and money by hiring fly-by-night drafters doing this type of work “on the side” while maintaining a full time job. The results are certainly less-than spectacular, and will always lead to more headaches as the coordination process unfolds. You will spend more time and effort coordinating over-and-over again, hence, delaying the project schedule, and angering the Owner, General Contractor, A/E firm, and the other MEP subcontractors.For examples of great coordination drawing work, click here ? Advantage Engineering. You can get several samples of HVAC, plumbing coordination drawings, MEP design drawings, piping drawings, piping fabrication and coordination drawings, sheet metal coordination drawings & coordinated ductwork shop drawings.
For more detail Please visit here : http://www.adv-eng-tech.com/blog/coordination-drawings/