Controlling loads in demanding environments, like a construction site, requires exceptional skills. Heavy lifting is done with the help of jacks that are designed to tackle a wide range of capacities, but must at the same time also be easy to operate.Basically, two types of equipment are used for lifting heavy loads at a construction site. They are rod climbers and strand climbers. Rod climbers are smaller, lighter, flexible and offer wide lifting capacities. They are suitable for placing or removing objects that require high degree of precision. The tungalyft equipment can be used to lift roof structures, flue pipes, sections of a bridge, or place formwork structures or move bulky machinery. Improved version of the rod climbers have a mechanical switch to ensure easy up and down movement. Since the mechanism is hydraulic, the lifting can be easily adjusted as per the weight and distance at a touch of the button. Rod climbers also come with optional hydraulic or mechanical switch mechanism.
Strand climbers are hydraulic tungalyft equipment used for handling, repairing and installing loads. Strand climbers are flexible and adapt to any object of large capacity easily. They can be connected with a universal hydraulic system to manipulate objects. Strand climbers are available with optional mechanical or hydraulic switch operation
Bygging-Uddemann has been successfully using an innovative and well-accepted steel tank erection system. The method uses controlled tanklyft with the help of hydraulic jacks. When the base unit has to be replaced, the jacks are set up externally. After the base is placed; the roof and the shell is assembled.
Completed roof and shell assembly is then lifted with the help of tank jacks that are mounted on lifting trestles. This makes space for a new level to be welded underneath the first one. The procedure is repeated, until the full height is reached. All through the process, the upper portion is positioned inside and along the wall of the tank. The tanklyft method is also used for repairing, increasing capacity or straightening when there is a tilt due to uneven settling. Lifting in all these activities is provided with a stable base.
Lifting loads at a construction site must be done using cost-effective methods, so that the job is accomplished with precision and in keeping with prescribed safety norms. Use of safe measures and ensuring worker safety must also be looked into when managing each project. For more information about heavy lifting, visit Bygging-Uddemann website.