There are the giant excavation companies who take care of the more formidable projects such as highway construction, dam and bridge building projects, tunnels, large shopping malls and the like. A smaller excavation contractor might specialize in apartment buildings, office complexes, water lines, utility trenches and so forth. Down the excavation food chain there are the smaller companies who take care of single family construction, landscaping, driveway restoration and snow removal.No matter what the size of excavation company, one thing is constant: the machinery necessary to perform all of these earth moving maneuvers is relatively large, heavy and maintenance intensive. On top of that, this same equipment is expensive; to purchase, lease and operate. If you've every personally had to write a check to an excavation contractor, you can attest to this fact.
As mentioned in the opening paragraph, there is a large variety when it comes to landscaping machinery. This is some of the more common pieces of equipment:
Road grader
Front end loader
Back hoe
Combination backhoe/loader
Dump truck
Crane
Dredge (for underwater excavation)
Track hoe
Chain trencher
Ditch witch
Wheel trencher
Bulldozer (aka Cat)
Drilling and boring machines
Although excavation contractors are not the most "sexy" part of any construction project, nothing can really begin, other than the planning stages, without them. Most every type of building venture usually starts off with some type of excavation whether it's a hole, trench, leveling or earth moving process. There is just no way around it!
To the layman, excavating and moving dirt looks to be a straight forward process but nothing could be further from the truth. Hours upon hours of design, survey and engineering work always precedes the arrival of even the first piece of equipment. Proper gradients for sewer and water lines must be taken into consideration. Adequate drainage for streets, sidewalks and buildings must be accounted for to ensure a safe and problem free finshed project.
While all of the preliminary trenching and grading is going on, care and coordination must be at the highest level to ensure that previous excavation work is not bothered or interfered with by a subsequent contractor installing something on top of an existing installation. This is a major concern on any large building project and can cause major delays and cost overruns.
Keep in mind that the excavation contractor is not only responsible for digging and moving the dirt. They must have a place to dispose of material that is no longer needed at the construction site. This usually involves owning and maintaining their own dumping grounds not to mention the man-hours and vehicle expenses necessary for transferring the excess material.
Finally, a lot of dust can be made during the excavation process. When combined with just a little bit of wind, this dust can cause havoc for neighboring properties and people. The excavation contractor is responsible for keeping the dust levels down with the use of water trucks constantly spraying and keeping things moist.