I. Test Before Delivery 9/12/2014 10:00 PMAngelBlade plasma power source has passed the test on stability of cutting parameters as required before shipping to customer. This test starts from Dec. 8, 2014, lasting for 3 days. Cutting performance and quality have been approved to meet the standard as well. Test Before Delivery
II. Main Cargo List 15/12/2014 9:00 AM
Get related inventory out of warehouse, including mainframe, cutting torch, consumables, user manual and flyer. Six cutting samples with different thickness fabricated during the test are also packaged in one box.
III. Packing Process 16/12/2014 9:00 AM
Three days before shipment, AngelBlade plasma power source is ready to be packaged. The packing box is made by wood material, solid and durable, light weight and dampproof.
Package
IV. Shipping to Shanghai 19/12/2014 8:30 AM
AngelBlade plasma power source is carried to a pickup truck, shipping to local airport first, waiting for the flight to Sharjah. The package (including all materials inside) weighs 81Kg. It is predicated that AngelBlade plasma power source will be arrived in Sharjah at 26/12/2014.
Read More:http://www.abplasma.com/blog/first-angelblade-shipping-to-sharjah/