GMUI signs Contract to purchase three additional mines located in North West Queensland, Australia with 200,000 tons + of copper from an Australian mining Company. The mining projects are Volga Elderberry, Mt Lidster and Mt Cobalt. The mines have 4 EPM’s and 7 Mining Leases and included in the reserves are Gold, Uranium and Rare Earths.Geochemistry analysis and reporting concludes that there are very high levels of iron oxide-copper-gold
deposits, with large magnetic and copper-in-soil anomalies that have yet to be exploited. The Geo-tech team in Australia is collaborating with the Geologists in USA who are completing all our NI 43-101 reports to put together a full feasibility study and complete an Australian code - JORC report as the next most important step in our discovery period.
A total exceeding $2 million was expended by a Geodiscovery Group who embarked on an exploration
program to prove up the resources on a limited area of the properties. Upon final completion/settlement of this contract, the mines will be owned outright and without debt obligations to GMUI.
Civil Engineering teams in Australia who have prepared in depth reporting have stated that due to the
topography, accessibility and the ease of reclaiming resources, i.e. no drilling or blasting. Mining can commence immediately as an open cut, no pre strip and is free dig.
More information is available on this and other company developments at www.gmuiinc.com email
info@gmuiinc.com or call 209-386-7753.
Forward Looking Statements
This news release contains forward-looking statements made by Gold Mining USA, INC. in reliance upon the safe harbor provisions of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. All such statements included in this press release, other than statements of historical fact, are forward-looking statements. Although Management believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. Actual results may differ materially from those indicated by these statements. The following risk factors, among others, could cause actual results to differ materially from those described in any forward-looking statements. These risks and uncertainties include, but are not limited to, economic conditions, changes in the law or regulations, demand for products an d services of the company, the effects of competition and other factors that could cause actual results to differ materially from those projected or represented in the forward looking statements. Forward-looking statements are typically identified by the words: believe, expect, anticipate, intend, estimate, and similar expressions or which by their nature refer to future events.