Dalkia, the European leader in energy services purchased a Magnapower 2 Metre wide eddy current separator (ECS2000) for their UK Biomass production site.The unit was supplied on time complete with drum magnet and out feed conveyor for the continuous removal of ferrous and non-ferrous metals and stockpiling of shredded waste wood for use as biomass into the electricity generating industry. The plant is has now been commissioned and is processing 56 tonnes of wood waste per hour.
Dalkia selected the Magnapower 2 Metre Eddy Current due to its performance and reliability after extensive test against other manufacturers equipment. The Magnapower eddy current is designed and manufactured in the UK
Magnapower are proud to have secured this contract against all major competition and it helps to cement their reputation as world leading suppliers of the best eddy current separators on the market.