1.Check the detailsCheck the paving wall first,then use the wet and clean soft brush to bring out the floating sand that are left in the crack.And the cement mortar should be pointed smoothly.Finally,make a deep cleaning when the adhesive layer and filling mortar are all dried.
2.Keep air-dry
After that,we should pay attention to protect the finished product,that is keep properly air-dry. The surface of the paving should be avoided sun exposure,keep air-dry of the room beyond 24 hours.Generally the day of late maintenance is not less than one week.
3.Clean
Firstly, preparing two barrels,one is for new cleaning agent,and another is for clean water.Secondly,soaking the cloth in the barrel with cleaning agent ,and then wipe the surface of the mosaic with the wet cloth.Thirdly,soaking the sponge in the clean barrel,and then wipe the mosaic with the wet sponge.Finally,wipe the surface of the mosaic again with the sponge until it is clean.
4.Install the switch socket
After paving and keeping air-dry, it needs to install the socket and the switch that removed before.In this way, the process of paving mosaics is completed then.
CP Mosaic
www.cpmosaic.com