Plans | Login    

Briefing Search
Keyword:
Category:

       

    
Author Details
ping jing

Preparation Work on Hammer Crusher Running


The Grading Impact Crusher Has Four Major Advantages

BriefingWire.com, 1/07/2013 -  

 

     The main parts of hammer crusher include hammerhead, broken plates, checking door and fastening bolt. Before we start the hammer crusher, some preparations must be made. Firstly, check if the fastening bolt has been loosed or lost. Secondly, carefully check the auxiliary equipments, such as feeding devices, couplings, motors and other equipment to see if they are in good condition. Thirdly, check if there is any foreigner in the crushing chamber, and if there are lumps or metal objects, they should be cleared immediately. Fourthly, check the amount of lubricating oil. In the last, give the driving signal. Machines can be turned on only after the agreement of next procedure. When we start the operation, there are also some tips to note. Number one: control the current when all the preparations have been well done. Number two: when the crusher is operating normally, the feeding device can be switched on to feed materials to the crusher, and according to the size of the feed block and the functioning of the crusher, adjusting the feeding amount, for example, if the material is too large or there is too many materials in the crusher, the amount of feeding materials should be reduced, and vice versa.

     Normally, the height of materials in the crushing chamber should not exceed 2/3 of the height of the crushing chamber. Number three: material feeding must be even and continuous to guarantee the improvement of the crushing capacity. At the same time, the size of the material cannot be too large, and they should be controlled at less than 120mm, which will not stop the hammerhead. Number four: during the process of feeding materials, attentions must be paid to avoid metals from entering into the crushing chamber to break the hammer and grate bars. Number five: after the automatic tripping of electrical equipment, if no course could be found, forced and continuous start is forbidden. Number six: check the equipments periodically during operation. Stop working if the temperature of bearing is over seventy centigrade or there is any abnormal noise. Number seven: stop the machines according to production line. That is to say, stop feeding first, and then stop the crushers after all the materials in crushers have been crushed over. When all the machines have been stored, check and clear them and write down the important data carefully.

We provide Professional technology, excellent product quality and intimate after-sales service when you purchase raymond mill, Rod Grinding Mill, from our company.As a professional mining machinery exporter, we will win your trust with our delivery speed, Enterprises Credit and product quality.

 
 
FAQs | Contact Us | Terms & Conditions | Privacy Policy
© 2026 Proserve Technology, Inc.