It can be clearly demonstrated that if the site mix screed is forced action mixed, generally in a screed pump which has the same capability of a ready mix plant, there should be no reason for failure if the correct proportions are followed. The cement, preferably CEM 1 class 42.5N, is gauged into a 260 litre mixing vessel and filled with sand complying with BS EN13139 0-4mm grade plus the addition of any proprietary products to the pre-agreed mix design.This gives complete control of quality, quantity, mix and water content to the screed specialist in order to achieve optimum performance. Due to the general mix parameter of 1:3-4.5 this method is completely satisfactory and testing can always be carried out to ensure that the screed is fit for purpose. The recognised testing method is a BRE drop hammer test in compliance with the current standard of BS8204:1 2003 and perhaps this should form part of the screed package. Ready mixed screeds would not necessarily pass the test as compaction and workability play a huge part.
The major quality benefits of mix screed over ready mix screed are:
better efficiencies
increased quality control
more cost effective
better waste management
lower carbon footprint
Site mix advantages
complete control over start times as sand and cement can be delivered in advance
minimal waste as the screeder has total control of the mixed quantities resulting in improved carbon footprint
screed is permanently fresh and installed in optimum time
easy to manage change requests and varying depths
added control of starting and finishing points
reduced risk of re-agitated mix and dry jointing which leads to poor compaction
allows site mixture of additives and cement replacements which is not possible with ready-mix
more competitive pricing structure
very easy to postpone/cancel due to unforeseen circumstances
Ready mix disadvantages
no control over plant breakdown
many logistical hurdles to overcome in order to guarantee delivery on time to site
High volume of waste if screed -
is thinner than anticipated and no other areas are available to use the screed
if next joint location cannot be achieved
seasonal changes to the consistency of the screed – in summer too dry; in winter too wet
poor compaction if screed is too dry
poor finish if screed is too wet plus increased shrinkage due to high water/cement ratio
day joints would be random with no control to comply with pre-agreed locations
not guaranteed to contain correct retarders and mix design due to risk of human error caused by varied mix design requirements by different clients
additional loads might not be an option if there is a variation of screed depth or will attract a premium cost for small loads
high cost to purchase plus high cost to discard