Why succumb to unnecessary losses each time you return an aircraft?The Average overspend at lease end over $1.5m for Narrow Body Aircraft & over $3.5m for Wide Body Aircraft. Be proactive & avoid the following story:
One Engine failed the final borescope & off course the Lessor would not accept the aircraft & no substitute engine available.
The engine needed an Engine Shop Visit to rectify & meet the required Redelivery Conditions. Engine removed but ESV Slot not immediately available.
ESV input found after one month & required a one-month input, Engine was then reinstalled back on wing.
End of Lease C Check now more than 30 days from Redelivery Date, another of the redelivery conditions therefore another C Check required at short notice.
MRO input not immediately available, one confirmed after 6 weeks.
The aircraft was finally redelivered over 3 months late with the Airline (on top of all the other expenses) paying double rent for the period of the overrun.
SAS has the pleasure to invite you to our Aircraft Leasing Practical Workshop on 10 Nov 2020
Time: 09:00 GMT+0
Aircraft Leasing Practical Workshop features & benefits:
Gain an understanding related to dealing with all Leasing Issues
Presented by a Subject Matter Expert with 20 Widebody lease returns successfully completed
Minimise your exposure – Potential for Significant Saving during the return Process
Avoid Traps & Pitfalls which can be extremely costly
The Workshop is taking place online – Tuesday, 10 Nov 2020. Attendees will be entitled to:
MP4 File of the entire proceedings
Contact List of Attendees for Networking
Associated Documentation & Guidance Information
Certificate confirming attendance of the event
Cost/Delegate: 495 Euro + discount for Multi Delegate Attendance (15% for 2 persons – 25% for 3 persons)
Moderator: Steve Bentley, CEO of Sofema
Subject Matter Expert: Chris Davey, Managing Director of CD Aviation Consultancy Ltd – Previously Head of Aircraft Asset Management of Virgin Atlantic Airways
Conditions of Attendance: Any subject can be covered & discussed to a specific understanding. However Specific Lease Companies, Airlines or Aircraft Types by MSN may not be referenced directly–the purpose of the event is to foster a detailed generic understanding of challenges & solutions.
Morning session
Overview of Aircraft Redelivery Market
Planning & Internal Preparation
Why to Start early – 2 years out for WB 18 months for an NB (How to recover lost time)
Return requirements. Confirm the basics.
Major Checks & condition of the major Components – Title Engines, C Check Life, Livery, Landing Gear Life
Read the lease – Especially Definitions, AD Compliance, Configuration
Documentation – To include Tech Records – Electronic or physical Review – Certificates & Form of Certificates
Redelivery Conditions 1 (Overview) Parts, 120% Rule, PMA, EPA, Burn Certs, Repairs, DER
Lessor Engagement – Discuss internal understanding established in the above items with Lessor
Agree on EOL sequence of events – Major Check, Livery, Ground Checks, Demo Flight, Defect Rectification, Redelivery
Mutual understanding & get it in writing so there are no surprises
Afternoon Session
Redelivery Conditions, Common traps
Engine Borescope Inspections – Export C of A, Modifications, STC’s, Terminating action of Inspection AD’s & Repair inspections
Technical Records – The Delivery Binder
Maintenance Reserves – Claims for Maintenance Events – EOL Compensation/Part Lives
Money or Metal, Contractual Issues – Is there a Win/Win?
Impact of Parking/Storage
Q&A
Book your Slots – email office@sassofia.com